Pilot launchpads for electric fleet electrification by region

The most successful fleet electrification programs start with a single well-chosen site. We identify your strongest pilot location by region, design the infrastructure for it, and build the operational playbook that makes every site after it faster and cheaper to deploy.

Get in touch
Pilot site selection

Choose the right first site and your entire rollout accelerates

The pilot site sets the template for everything that follows. A well-chosen pilot generates real operational data, validates your financial model, builds internal confidence, and creates a replicable deployment blueprint.

  • Pilot site evaluation across grid readiness, fleet utilization, and route predictability
  • Ranked shortlist of candidate sites with selection rationale by region
  • Stakeholder alignment assessment including depot management, fleet operators, and utility
Access Tool
Happy truck driver with electric vehicle
Trusted By Customers
Across Industries
Pilot infrastructure design

Design the pilot infrastructure to generate data, not just charge vehicles

We design the pilot infrastructure with this data collection objective in mind: the right metering, the right telematics integration, the right reporting configuration, and the right KPIs defined before the first vehicle plugs in. This means your pilot report is not just a proof of concept — it is the evidence base for scaling to your next ten sites.

  • Pilot infrastructure sized and specified for your selected site and fleet
  • Metering and monitoring configuration designed for data collection from day one
  • Telematics and TMS integration plan included in pilot design
Access Tool
Happy truck driver with electric vehicle
Scaling from pilot to program

Turn your pilot results into a rollout playbook for every region

We help you build this playbook from your pilot results and adapt it for regional variation — different utility structures, different incentive regimes, different vehicle mixes - so that your second and third sites deploy faster and with greater financial certainty than your first.

  • Pilot results analysis and validation against pre-deployment financial model
  • Deployment playbook covering infrastructure, operations, and utility engagement
  • Revised financial model incorporating real pilot performance data
Access Tool
Man working at computer
Man working at computer

Customer Stories

Optimized Charging for School Fleets Across North America

First Student maximizes energy savings and charger uptime for schools across North America

How Takealot & Aeversa Achieve up to 65% Reduction in Energy Costs

Learn how Takealot and Aeversa Achieve up to 65% Reduction in Energy Cost for Electric Fleets.

Geotab’s Platform Enhanced by Smart EV Charging Solutions

Geotab Marketplace leads the way for connecting fleet telematics and smart charging

WattEV achieves operational excellence for EV truck charging sites

WattEV uses Ampcontrol’s software to reduce the total peak power demand and ensure high availability of the charging infrastructure for the fleets.

7Gen Offers AI-Powered Charging Management for Turnkey Solutions

7Gen electrifies Canadian EV fleets with Ampcontrol charging management software

Electrada AI-Powered EV Automatic Load Management

Learn how Electrada uses AI-powered EV automatic load management system to lower operational costs for their fleets and customers in this case study.

Aeversa Overcomes Grid Capacity Using Load Management Software

Aeversa uses Ampcontrol for the energy flow and monitoring the charger uptime of electric fleet depots in South Africa.

Revel uses AI-powered solutions to increase fleet efficiency

Revel uses Ampcontrol’s software to reduce fuel costs and provide public charging access.

TALK WITH AN EV FLEET EXPERT

Power your operations with Ampcontrol

Maximize energy efficiency
Increase charger uptime
Monitor 24/7
Certifications & compliance
FAQs

How do you select the right pilot site?

We evaluate candidate sites against six criteria: grid readiness, meaning how much available capacity exists today without an upgrade; fleet utilization, meaning whether the vehicles at this site run high enough mileage to generate meaningful financial data; route predictability, meaning whether return times and dwell windows are consistent enough to validate smart charging; stakeholder alignment, meaning whether depot management, fleet operators, and the utility are engaged and cooperative; incentive availability, meaning whether regional or local programs apply specifically to this site; and infrastructure complexity, meaning whether the site has unusual physical or electrical constraints that would make it atypical. The ideal pilot site scores well on all six and produces lessons that transfer directly to your broader network.

How many vehicles should a pilot include?

The right pilot size depends on your overall fleet and what you need to prove. For most operators, a pilot of 5 to 15 vehicles is sufficient to generate statistically meaningful operational data, test the full charging workflow including dispatch coordination and driver notification, and validate the financial model at a scale that finance teams find credible. A pilot that is too small — one or two vehicles — produces anecdotal data that is difficult to extrapolate. A pilot that is too large starts to look like a full deployment and loses the cost and speed advantages of a controlled learning environment. We recommend the minimum size that answers your key business questions.

How long should a pilot run before scaling?

A minimum of 6 months of operational data is needed to capture meaningful seasonal variation in energy consumption, solar generation if applicable, and driver behavior patterns. 12 months is ideal and gives you a full annual load profile that is directly comparable to your pre-pilot baseline. For operators under commercial or regulatory pressure to scale quickly, it is possible to draw preliminary conclusions after 3 months for the most critical metrics — charger utilization, energy cost per km, and peak demand profile — while continuing to collect data in parallel with early-stage expansion planning. We structure the pilot KPI framework to support both timelines.

What happens if the pilot results are different from the financial model?

This is common and expected — real operational data almost always differs from modeled assumptions in some areas. The most frequent variances are in actual energy consumption per vehicle, which depends on real driving patterns and load factors, and in grid demand profiles, which depend on how drivers actually use the charging infrastructure rather than how the schedule assumed they would. When pilot results diverge from the model, we conduct a variance analysis to identify the source of the difference, update the financial model with real data, and assess whether the variance is site-specific or likely to appear at scale. In most cases real-world results are within 10 to 20 percent of the model, and the updated model becomes a stronger basis for the scaling business case.

Can the pilot cover multiple regions simultaneously?

Yes, and for operators with large national or international networks, running parallel pilots in two or three regions is often more efficient than a strict sequential approach. Regional pilots allow you to capture variation in utility structures, incentive regimes, driver behavior, and climate effects simultaneously, which produces a richer evidence base for the scaling playbook. The trade-off is higher upfront coordination complexity and capital commitment. We recommend parallel pilots when the regional variation is significant enough that a single-site pilot would not be representative — for example, if your network spans both high-incentive markets like California or the Netherlands and lower-incentive markets where the financial case needs to be made more carefully.

What is a deployment playbook and why does it matter for scaling?

A deployment playbook is a documented set of decisions, configurations, and processes that have been validated through real operational experience and can be replicated at each new site without starting from scratch. It typically covers site selection criteria and scoring methodology, infrastructure specification including charger type, power level, and metering configuration, utility engagement process including typical lead times and required documentation, driver onboarding and notification workflow, energy management platform configuration, and financial model assumptions updated with real performance data. Without a playbook, each new site requires the same discovery and decision-making process as the first — with a playbook, the second site deploys in roughly half the time and the fifth site in a quarter of the time.

Questions About Ampcontrol?

Get Started With Ampcontrol

Ampcontrol Logo
Wöhrmühle 2
91056 Erlangen
Germany
C. de Eloy Gonzalo 27
28010 Madrid
Spain
345 7th Avenue
New York, NY 10001
United States
Copyright © 0000 Ampcontrol Technologies, Inc. All rights reserved